PMP Formulas You Must Know (Fast Sheet)

Authors

Short, compact, zero fluff. These are the formulas that actually show up.

Earned Value (EVM)

  • PV = Planned Value
  • EV = Earned Value
  • AC = Actual Cost

Variances

  • CV = EV - AC
  • SV = EV - PV

Indexes

  • CPI = EV / AC
  • SPI = EV / PV

CPI < 1 → over budget
SPI < 1 → behind schedule

Forecast

  • EAC = BAC / CPI (most commonly tested)

Critical Path

  • Longest path = shortest possible project duration

Float = LS - ES = LF - EF


Communication Channels

channels = n(n-1)/2

This shows up every year.


Expected Monetary Value (EMV)

EMV = probability × impact

  • positive → opportunity
  • negative → threat